  "id": 858502,
  "name": "Terre Haute & I. R. R. Co. v. Chicago, P. & St. L. Ry. Co.",
  "name_abbreviation": "Terre Haute & I. R. R. v. Chicago, P. & St. L. Ry. Co.",
  "decision_date": "1894-03-23",
  "docket_number": "",
  "first_page": "41",
  "last_page": "45",
  "citations": [
    {
      "type": "official",
      "cite": "53 Ill. App. 41"
    }
  ],
  "court": {
    "name_abbreviation": "Ill. App. Ct.",
    "id": 8837,
    "name": "Illinois Appellate Court"
  },
  "jurisdiction": {
    "id": 29,
    "name_long": "Illinois",
    "name": "Ill."
  },
  "cites_to": [],
  "analysis": {
    "cardinality": 478,
    "char_count": 8956,
    "ocr_confidence": 0.479,
    "sha256": "ef837085f21e5df7cb5ad9f1de68cce056baf58418b15ab922e1f3dd876e0ff2",
    "simhash": "1:81b6bbcabc3000d8",
    "word_count": 1595
  },
  "last_updated": "2023-07-14T16:03:00.879097+00:00",
  "provenance": {
    "date_added": "2019-08-29",
    "source": "Harvard",
    "batch": "2018"
  },
  "casebody": {
    "judges": [],
    "parties": [
      "Terre Haute & I. R. R. Co. v. Chicago, P. & St. L. Ry. Co."
    ],
    "opinions": [
      {
        "text": "Mr. Presiding Justice Sample\ndelivered the opinion of the Court.\nThere is no substantial dispute as to the facts in this case. The controversy seems to arise as to the proper conclusion to be drawn therefrom. The appellant contends the facts show that the appellant\u2019s employe, the conductor, and the appellee\u2019s employe, the engineer, were co-ordinate with a limited authority, under the general supervision in running the engine, of the appellant\u2019s train dispatcher, whose orders were sent to and received by both, and therefore both were equally responsible for their proper execution. Hence, it is said, the collision occurred by the negligence of both, and there can be no recovery. The appellee contends that the facts show that for this particular business the engineer was the servant of appellant, under the control of its pilot or conductor, and was actually in its service at the time of the collision. Our conclusion is, the effect of the contract was, that if the appellee would furnish its engineer and fireman to mechanically operate the engine, under the appellant\u2019s superintendence, then it would furnish a conductor to take charge of and run the same from East St. Louis to Smithboro, for fifty cents per mile. That appellant\u2019s conductor actually directed the running of the engine, the same as any other conductor, is unquestionable. He testified, \u201c I directed the movement of the engine.\u201d The fact that the train dispatcher directed his orders to the conductor and engineer did not change or affect in any way the relation of superior and subordinate, which in that service they sustained to each other. It is not shown but that all such messages are so directed to insure notice to each.\nDoubtless an engineer is not bound to obey an order that he knows will imperil his life or the property in his charge, yet he is bound to obey what at the time appears to him to be a reasonable command. From the evidence it would not appear unreasonable to the engineer to obey the order of the conductor to pull out from Pocahontas after Ho. 9 had passed, which was to have been met at Greenville, nine miles further east; especially in view of the statements then made by the conductor, that it carried no signals indicating a train was following, and that they would have plenty of time to make Greenville. The engineer might well rely on the information supposed to be possessed by the conductor, and obey his orders. The conductor knew the running time of the trains on that road, and at the time had a time table in his pocket. He also knew that Ho. 17 was then due when he opened the switch and gave the order to pull out. He testified, \u201c I knew about it, but had forgotten it.\u201d Our conclusion is that the conductor, as the servant of appellant, was in charge of the engine, and was required to exercise at least reasonable care in the performance of that duty. His negligence was that of appellant\u2019s, and therefore the judgment is affirmed.",
        "type": "majority",
        "author": "Mr. Presiding Justice Sample"
      }
    ],
    "attorneys": [
      "W. H. Dawdy and T. J. Golden, attorneys for appellant.",
      "Morrison & Worthington, attorneys for appellee."
    ],
    "corrections": "",
    "head_matter": "Terre Haute & I. R. R. Co. v. Chicago, P. & St. L. Ry. Co.\n1. Negligence\u2014Master Responsiblefor his Servant.\u2014A railroad company contracted with another railroad company to run one of its engines over the track of the latter from East St. Louis to Smithboro; the former company furnished a conductor, and the latter an engineer and fireman. After passing a train at a way station the conductor signaled the engineer to go ahead, saying that he had time to run to Smithboro before another train was due there. In doing so a collision occurred, and the engine was damaged. In an action brought by the latter company against the former to recover the damage, it appeared that the conductor was familiar with the road, had a time table and knew that the colliding train was due at Smithboro, but had forgotten it. The engineer was not familiar with the road, had no time table and wasignorant of the approaching train. It was held that the conductor was negligent and that such negligence was chargeable to the company employing him so as to charge it with the damage done to the engine.\nMemorandum.\u2014Action of trespass on the case. Appeal from the Circuit Court of Bond County; the Hon. Benjamin R, Burroughs, Judge, presiding. Heard in this court at the August term, 1893, and affirmed.\nOpinion filed March 23, 1894.\nStatement of the Case.\nOn the 20th day of June, 1892, the appellee had two locomotive engines at East St. Louis, which, owing to highivaters and washouts, it was unable to get out OAer its oavu line of road, whereupon application was made to appellant to transfer them over its road to Smithboro. The folloAving dispatches effected the arrangement:\n\" Dated 5, 20, 1892.\nTo 1ST. EL Elliott, at Terre Haute via Smithboro: We would like to get engines 37 and 49 to Smithboro as soon as possible. * '* * What will you charge us to run them to Smithboro 1 D. W. Biker.\"\n\" From Terre Haute, dated 5, 20, 1892.\nTo D. W. B.: We will take care of Eng. 36 and 49.\nH. EL E.\u201d\n\u201c From St. Louis, dated 5, 20, 1892.\nTo D. W. B.: Beplying to your message to Mr. Elliott, the running of your engines Hos. Y and 19 (meaning 3Y and 49). We will run them to Smithboro for you and charge you the usual rate, fifty cents per mile. I. Hill.\u201d\nThe parties named had the right in their official capacity, to make the arrangement on behalf of their respective roads. On the morning of May 21, 1892, L. T. Foote, engineer, and Harry Bensen, fireman, who, for appellee, and in its employ, had charge of engine 49, with C. Smith, pilot or conductor, acting for and in the employ of appellant, placed the engine on appellant\u2019s road at East St. Louis, where the following order was received:\n\u201cSpecial order Ho. 1111, received 12:54 a. m.\nFrom Tebbe Haute, May 21, 1892.\nConductor and engineer J. S. E. engine 49. Relay Depot Station.\nRun to Smithboro wild. Run regardless of all freight trains. Hse one hour and thirty minutes on time of H o. Y.\nC. Smith, R. B. W.\nFoote.\u201d\nAnother order similarly addressed, was received at Gris-wold Place station, which is not material. At Highland station, the following order was received: \u201c Special order, Ho. 1122. From Terre Haute, May 21, 1892. Conductor and engineer J. S. E., 49. You have until five-thirty (5:30) a. m., to run to Greenville against Ho. nine (9); meet and pass Ho. twenty-nine (29), at Greenville.\nSmith. R. B. W.\nFoote.\nCorrect. 4:58 a. m.\u201d\nThe engine got somewhat out of order, so that Greenville was not reached on time, and a stop was made at Pocahontas for from fifteen to twenty minutes to repair engine, at which place Ho. 9 passed, going west, some nine miles distant east from Greenville. It seems that the engineer had no time table. Heither he nor the fireman had been over the road of appellant before, and knew nothing about the time of the trains. The conductor, Smith, had a time card; had been regularly running on the road, and knew the running time of the trains. As soon as Ho. 9 passed Pocahontas, going west, the conductor threw the switch and gave the engineer the signal to back out and the run was commenced for Greenville, some nine miles distant. After going about three miles, along which there were several curves in the road, just after passing one of them, a head end collision occurred, about six o\u2019clock, a. m., with engine Ho. 17, drawing the \u201cDiamond Special,\u201d a passenger train, which resulted in the demolition of engine 49, to recover which damage this suit was brought and a verdict and judgment obtained below for the sum of $3,207.48, from which this appeal was taken.\nIt appears from the evidence of the conductor, Smith, that he knew that Ho. 9 was due at Greenville at 5:20 a. at., and that Ho. 17, the Diamond Special, was due there at 5:32 a. m., only twelve minutes thereafter. He was asked this question: \u201cWell, now you knew about its time (the time of Ho. 17, the Diamond Special) at that time ? A. I knew about it but had forgotten it. Q. Y ou did not mention it to the engineer or fireman ? A. Ho, sir. Q. Who had control now of the engine this time in leaving and pulling out, if any one ? A. I directed the movement of the engine.\u201d The engineer testified that he never saw Smith until that morning aboard the engine, and that he was piloting engine 49 from East St. Louis to Smithboro ; that his duties were the same as a conductorhe had charge of the engine. \u201c I was going by his orders and the train dispatcher\u2019s.\u201d He further testified that when Ho. 9 passed Pocahontas, Smith opened the switch, signaled him to pull out, and said, \u201c We have plenty of time to make Greenville for Ho. 11, I think it was.\u201d The fireman, JBensen, testified that \u201c when Ho. 9 came, Mr. Smith said : \u201cWell, number 9 is not carrying signals; we have got time enough to go to Greenville for Ho. 11.\u201d He threw the switch, we backed out, kept on, and we started for Greenville for Ho. 11.\u201d These statements are not contradicted.\nW. H. Dawdy and T. J. Golden, attorneys for appellant.\nMorrison & Worthington, attorneys for appellee."
  },
  "file_name": "0041-01",
  "first_page_order": 37,
  "last_page_order": 41
}