  "id": 5322626,
  "name": "Harry Deatherage and Mabel Deatherage, Claimants, v. State of Illinois, Respondent",
  "name_abbreviation": "Deatherage v. State",
  "decision_date": "1978-07-25",
  "docket_number": "No. 75-CC-1332",
  "first_page": "585",
  "last_page": "588",
  "citations": [
    {
      "type": "official",
      "cite": "32 Ill. Ct. Cl. 585"
    }
  ],
  "court": {
    "name_abbreviation": "Ill. Ct. Cl.",
    "id": 8793,
    "name": "Illinois Court of Claims"
  },
  "jurisdiction": {
    "id": 29,
    "name_long": "Illinois",
    "name": "Ill."
  },
  "cites_to": [
    {
      "cite": "158 Ill. App. 557",
      "category": "reporters:state",
      "reporter": "Ill. App.",
      "case_ids": [
        5320665
      ],
      "opinion_index": 0,
      "case_paths": [
        "/ill-app/158/0557-01"
      ]
    },
    {
      "cite": "30 Ill.Ct.Cl. 420",
      "category": "reporters:state",
      "reporter": "Ill. Ct. Cl.",
      "case_ids": [
        2755641
      ],
      "opinion_index": 0,
      "case_paths": [
        "/ill-ct-cl/30/0420-01"
      ]
    }
  ],
  "analysis": {
    "cardinality": 343,
    "char_count": 4999,
    "ocr_confidence": 0.815,
    "pagerank": {
      "raw": 4.03580807328026e-08,
      "percentile": 0.15791036465832564
    },
    "sha256": "ab46c06f411e669661ed20305e80e80918bcc27ad7ef1496248f9a8dafba08e2",
    "simhash": "1:16b7731d438c8b3f",
    "word_count": 834
  },
  "last_updated": "2023-07-14T16:54:10.322906+00:00",
  "provenance": {
    "date_added": "2019-08-29",
    "source": "Harvard",
    "batch": "2018"
  },
  "casebody": {
    "judges": [],
    "parties": [
      "Harry Deatherage and Mabel Deatherage, Claimants, v. State of Illinois, Respondent."
    ],
    "opinions": [
      {
        "text": "Polos, C.J.\nClaimants, Mabel and Harry Deatherage have brought this action to recover for damages to their property allegedly caused by the re-grading of adjoining lands by the State of Illinois. Claimants contend that the State violated Ill.Rev.Stat. Ch. 42, \u00a712-4, which provides, in pertinent part,\n\u201cWhenever a natural ditch or drain constructed in the course of natural drainage crosses a public highway...the highway authority shall construct and thereafter keep in repair and maintain a bridge or culvert of sufficient length, depth, height above the bed of the drain or ditch, and capacity to serve the needs of the public with respect to the drainage of the lands within the natural watershed of such drain, not only as such needs exist at the time of construction, but for all future time.\u201d\nIn 1973, the Department of Transportation began construction of a highway known as Route 203 in Madison County, Illinois. The project included relocating and regrading a rail crossing approach on Maryville Road, at its intersection with Route 203. During the course of construction, the State interfered with drainage on three separate parcels of real estate.\nThe first parcel of real estate was referred to as the \u201chome place\u201d, and was located on Maryville Road immediately north of its intersection with Route 203. Prior to the start of construction, there was a culvert under Maryville Road at a low point in Claimant\u2019s field, which drained into a storm sewer on the west side of Maryville Road. During the course of construction, the culvert was blocked by the new fill which was brought in by the State.\nMr. Deatherage testified that he advised the State\u2019s project engineer that the land would flood if the fill was placed in the culvert, but the State persisted in it\u2019s plans. The fill was put in place and later cut to form a new culvert. However, during the time the culvert was filled there was no drainage, and Claimants\u2019 land flooded. The new culvert was placed about 150 to 200 feet north of the low point in the field, and Claimants\u2019 field has flooded each year since then.\nClaimant testified that as a result of the flooding on the \u201chome place\u201d he lost his planting of Indian corn, and a portion of his planting of soy beans in 1973. He said that his damages totalled $1,690.00.\nThe second parcel of real estate was a seven acre tract referred to as the \u201cBorland property\u201d which also fronts on Maryville Road. This property is across Highway 203 from the \u201chome place.\u201d Claimant had leased that property and farmed it for about 15 years prior to 1973. Due to the flooding in the field in 1973, he could not plant his soy bean crop as he had done previously, and Claimant said he was damaged in the amount of $703.00.\nThe third parcel of real estate with which we are concerned consists of two acres, and was referred to as \u201cKnight\u2019s Home Sites.\u201d Claimant had farmed the land previously, and in 1973 had planted pumpkins in the field. Again because dirt brought in for elevating the highway, the water was directed to a new low area across the field of pumpkins, thus destroying the entire field of pumpkins and some blue grass sod. Claimant alleges that his damages in 1973 as a result of this flooding totalled $3,126.00.\nThe State\u2019s engineer admitted that the drainage problems on these fields had been pointed out to him, that the areas in question did flood, and that he had jurisdiction over the entire job.\nClaimant continued to experience flooding problems in both 1974 and 1975, and the final grading of the ditch leading to the new culvert was not completed until late July, 1975. Claimant testified that he suffered additional losses in 1974 in the amount of $1,404.00 and additional losses in 1975 in the amount of $2,315.00.\nIt appears that drainage problems on the property are continuing.\nIt is long been held that one who negligently alters the natural flow of water on the property of an adjacent landowner, and thereby causes damage, is liable to that landowner. Emerson v. State, 30 Ill.Ct.Cl. 420; Eimes v. Cleveland, Cincinnati, Chicago and St. Louis Railroad, 158 Ill. App. 557.\nHere the testimony in uncontradicted that in performing construction on Highway 203, at its intersection with Maryville Road, the State interferred with the natural flow of water drainage from Claimants\u2019 properties, causing damage to Claimants.\nRespondent contends that Claimants\u2019 computation of damages is imprecise, and insufficient on which to base an award. However, the Court finds Claimants\u2019 testimony as to the estimates of damages was sufficient, and the Court further notes that Respondent has failed to present any evidence contradicting that testimony.\nClaimants are therefore awarded the sum of $9,238.00.",
        "type": "majority",
        "author": "Polos, C.J."
      }
    ],
    "attorneys": [
      "Daily & Walker, Attorneys for Claimant.",
      "William J. Scott, Attorney General; William E. Webber, Assistant Attorney General, for Respondent."
    ],
    "corrections": "",
    "head_matter": "(No. 75-CC-1332\nHarry Deatherage and Mabel Deatherage, Claimants, v. State of Illinois, Respondent.\nOpinion filed July 25, 1978.\nDaily & Walker, Attorneys for Claimant.\nWilliam J. Scott, Attorney General; William E. Webber, Assistant Attorney General, for Respondent."
  },
  "file_name": "0585-01",
  "first_page_order": 699,
  "last_page_order": 702
}